This aerial photo captures the Logistics Warehouse for Daimler Trucks (Freightliner) currently under construction. This warehouse, when complete will be 116,590 SF and constructed in two phases to allow for an easy transition from the existing loading docks to the new loading docks. Phase 1 was completed in February and Phase 2 is scheduled for completion by the end of the year.